3parts potassium nitrate 1parts powdered sugar best rocket fuel mix
Category Archives: Uncategorized
Public Health phone records Guam
Watch “How To Make Sugar Rockets” on YouTube
2pounds stump remover also known as potassium nitrate and two cups of water
Boil 2 cups of water, and then adding 2 pounds of potassium nitrate until the mixture is dissolved. Continue to boil the water until it has all evaporated and you are left with just a white powder in the bottom of the pot. It may be clumped up at this point, so use a hammer or hard surface to break up the clumps
One part potassium nitrate 1 part sugar 1 part water and a bit of honey
http://www.ehow.com/how_4929615_rocket-fuel-out-of-sugar.html
more mix 150g of KNO3 with 80g sugar 80g of water and a teaspoon of honey. Mix with a wood spoon to avoid sparks
Pix
Pix7
$600 solar kit
$600 kit" consists of:
One Uni-Solar 32-watt amorphous-silicon PV module, 12 volts: $180.00
One Morningstar 6-amp charge controller, 12 volts: $40.00
Two Deka 92 amp-hour sealed batteries, 12 volts: ($130.00 each) $260.00
One Aims 800-watt modified sine wave inverter, 12 volts: $65.00
TOTAL: $545.00
This leaves you with $55 for wire, battery cables, mounting hardware, fuses between components, and the miscellaneous odds and ends that are always needed for any project of moderate complexity
USA household renters and owners
| ouseholds- Renters & Owners | ||||
| Type of Household | Households | % of U.S. Total | Residents | % of U.S. Total |
| Renter-Occupied | 43,701,738 | 37% | 111,118,927 | 35% |
| Owner-Occupied | 74,506,512 | 63% | 202,228,998 | 65% |
| Total | 118,208,250 | 100% | 313,347,925 | 100% |
| Source: 2015 American Community Survey, 1-Year Estimates, US Census Bureau. Updated 10/2016 | ||||
PowerLineCosts Overhead 1/4million Permil underground 1.5million permile
The estimated cost for constructing underground transmission lines ranges from 4 to 14 times more expensive than overhead lines of the same voltage and same distance. A typical new 69 kV overhead single-circuit transmission line costs approximately $285,000 per mile as opposed to $1.5 million per mile for a new 69 kV underground line (without the terminals). A new 138 kV overhead line costs approximately $390,000 per mile as opposed to $2 million per mile for underground (without the terminals)."
Mahalo
SIGNATURE:
Clifford "RAY" Hackett www.rayis.me RESUME: www.rayis.me/resume
I founded www.adapt.org in 1980 it now has over 50 million members.
$500 of material=World’s fastest hydrofoil sailboat. http://sunrun.biz









